|
WHEELER, Wesley D.
President, Wheeler Associates
95
Mill Spring Lane
Stamford, CT 06903-1635
Telephone:
203-329-1680
Fax: 203-968-2150 &
Cell Phone / Handy #: 917-855-2850
A.O.H #: 203-968-8399 Fax: 203-968-8396
Email : shipyards@weswheeler.com
URL: http://www.weswheeler.com/
|
 |
CURRICULUM
VITAE:
1984 - President - WHEELER ASSOCIATES- Shipyard
Representative, Arbitrator, Marine Forensic Expert, Surveyor,
Ship/yacht Construction Consultant.
1983-1984 - J.J.HENRY CO., INC., NY, Vice President, Marketing
strategy with emphasis on foreign client possibilities.
1974-1983 - WESLEY D. WHEELER ASSOCIATES, LTD, President COO
of 20 employees with abouit half of staff devoted to agency
representation of foreign shipyards and manufacturers, crewing
and the other half devoted to technical consulting:
- Numerous
ship surveys for purchase, damage, condition, repair and
conversion,
- Preparation
of damage stability booklets for Sea-Land D-9 class containerships,
- Surveys,
preparation of special survey and offhire specifications,
bid solicitation and review and negotiation out of bareboat
charter of VLCC storage vessel S/T "F.A.DAVIES" for ARAMCO,
Houston, den Haag and Daharan, Saudi Arabia,
- Survey,
preparation of plans, specifications, test memos, instruction
books and yard supervision of IGS/COW installation for MTL
"OSWEG0 HOPE" & "OSWEGO SPIRIT".
- Complete
scantling re-evaluation of the tank section of the tanker
S/T "COASTAL KANSAS" significantly reducing class structural
renewal requirements,
- Preliminary
design of 30,000 dwt 20 knot RO/RO ship for U.S. government
Military Sealift Command charter,
- Preliminary
design of conversion of naphtha tanker S/T "GRAND CORCO"
to live sheep carrier,
- Preliminary
design of 283 FEU reefer containership with two gantry cranes
for United Brands for construction in Greece,
- Preliminary
design of 25,000 dwt self-unloading bulk carrier for Marine
Transport Lines for construction in Spain,
- Negotiation,
design, plan approval and inspection assistance for 4 x
1,000 TEU containership newbuildings at Namura-Imari, Japan
for ITEL/Seatrain,
- Contract
design and specifications for the conversion of 2 - 36,000
dwt twin screw tankers to RO/RO ships,
- Prepared
numerous grain trim and stability booklets/loading manuals
as well as voyage proforma loading recommendations,
- Plan
approval of 45,000 dwt chemical carriers "OGDEN DYNACHEM"
& "HUDSON" for OMI construction at Avondale Shipyards,
New Orleans,
- Supervision
of construction of a series of fishing trawlers for India
at Coazacoalcos and Salina Cruz, Mexico,
- Expert
testimony for City of Jacksonville, FL vs. Offshore Power
Systems regarding aborted shipyard construction,
- Perfection
of $24 million claim of AMOCO Trinidad vs. offshore pipelayer
"OCEAN BUILDER I" at Samaan Field, SE Trinidad regarding
field shutdown,
- Expert
witness regarding the sinking of the dredge "PITTSBURGH"
whilst under tow,
- Preparation
of technical study of the structure of the bulk carrier
"HANNA" prior to and cause of failure and sinking,
- Selection,
negotiation, purchase and operation of 2 x 4,000 dwt 'tween
deckers "ROMAN EDYTHE" & "ROMAN BERNARD",
- Managed
salvage and negotations of the beaching of the "ROMAN BERNARD"
as a CTL,
- Assisted
various banks in vetting of condition for financing and
disposing of defaulted ships,
- Performed
many reviews of records at classification society American
Bureau of Shipping,
- Represented
Falmouth Dockyards, UK; Hapag-Lloyd Werft, Bremerhaven,
Germany; Royal Schelde Shipyard, Vlissingen, The Netherlands;
Astilleros Espanoles, S.A., (8 yards), Spain;
ASTANO, el Ferrol, Spain; Neorion Shipyards Syros, Greece;
Waertsila Diesel, Vaasa, Finland
1972-1973
- AMERICAN BULK CARRIERS, NY, Technical Director, Fleet of
four tankers, four bulk carriers
- -
Assisted in design of conversion of 44,000 dwt tanker "ATLANTIC"
(ex"ARIETTA S. LIVANOS" together with forebody of the "PENNSYLVANIA
GETTY" forming a tanker of 52,000 dwt and managed the project
at Eleusis Shipyard, Greece from NY office.
- Negotiated
contracts for two x 125,000 dwt tankers at VALMET SHIPYARD,
Finland
- Surveyed
24,000 dwt wood chip carrier "YUHO MARU" and converted to
bulk carrier "YUKONMART" whilst sailing.
1971-1972
- ASTILLEROS ESPANOLES, S.A., Cadiz, Spain, Technical Counselor
- Was
part of design team for the new $80 million ship factory
being constructed at Puerto Real (Cadiz) with a 100 x 525m
one million ton graving dock with two 600t gantry cranes
able to be tandem operated for 1,200t block lifts. Assisted
design team on new 350,000 dwt tankers for MTL and prepared
5,000 + activity PERT chart for the design process.
1970
-1971 - COMMONWEALTH OIL CO., Ponce, Puerto Rico, Construction
Superintendent
- Built
new fully coated forebody for naptha and completely refurbished
the machinery and accommodations for 30,000 dwt tanker at
Wilton-Fijenoord Shipyard, Schiedam, the Netherlands becoming
the S/T "GRAND CORCO".
1969-1970
- MERI SHIPPING CO., OY, Helsinki, Finland, Construction Superintendent
- Designed,
negotiated and supervised conversion of the ice-strengthened
Baltic tween-decker "FENJA DAN" to the first fully cellurlarized
Finnish containership of 240 teu at Malta Drydocks, Valetta,
Malta, G.C.
1969
- AMERICAN TRADING AND PRODUCTION CORP, NY, Port Engineer,
Naval Architect, Fleet of eight U.S. Flag tankers
- Responsible
for technical problem solving and maintenance of regulatory
certificates.
1966-1968
- AMERICAN BULK CARRIERS, INC, NY, Naval Architect
- Designed
conversion of T2-SE-A1 tanker "MIDLAKE" of 17,000 dwt utilizing
the forebody of the Societe' Maritime Shell tanker "ISARA"
to 34,000 dwt tanker "MIDLAKE" under US flag at Avondale
Shipyards, New Orleans, LA.
1966
- H.M.TIEDEMANN & CO., INC.,NY, Commercial Manager
- Technical
advisor to North American Aviation for the conversion of
the minelayer/tug M/V "GIANT II" to cable layer for sonar
signature field off the Hawaiian Islands. Performed inclining
experiment and prepared mission and trim/stability book.
- Performed
technical consultation with team on aircraft carrier "SARATOGA"
regarding machinery performance at Mayport Naval Base, FL
- Solicited
commercial clients and supervised staff of 20.
1964-1966
- AMERICAN BULK CARRIERS, INC., NY, Naval Architect
- Designed,
negotiated contract and supervised conversion of tankers
S/T "SATUCKET" (T3) with forebody of bulk carrier "MONTAUK"
(extanker "J.W.van DYKE") to produce a bulk carrier of 24,000
dwt at Newport News Shipbuilding and Drydock Co., VA
- Designed
conversion of T2-SE-A1 tanker TE/S "SABINE" by joining together
with Societe' Maritime Shell forebody "ISIDORA" following
survey and obtaining all technical data from France to produce
the 34,000 dwt tanker "SABINE"
- Supervised
ship repairs, loading and inspections maintaining liason
with ABS and USCG for regulatory compliance.
1963-1964
- M.ROSENBLATT & SON, INC., NY, Senior Project Engineer
- Supervised
detailed design working drawings for oceanographic Research
Vessels AGOR9 & AGOR10
- Performed
plan approval of MHI 65,000 dwt tankers and Maizuru 42,000
dwt bulk carriers for Maritime Overseas Corp., NY
1962-1963
- REMOLCADORES de MALAGA, Cadiz, Spain, Naval Architect
- Designed
a series of 8t bollard pull developable hull tugs, 2 built.
1961-1962
- COMMERCE TANKERS, INC., NY, Construction Superintendent
- Model
testing, plan approval and construction supervision for
the construction of a 25,000 dwt midbody at Sociedad Espanola
de Construccion Naval, Matagorda, Cadiz, Spain for US flag
T2-SE-A1 tanker "BARBARA" including ABS & USCG approvals.
1959-1961
- JOHN J. McMULLEN ASSOCIATES, INC., NY, Project Naval Architect
- Designed
"ELIZABETHPORT" class (D-6) conversions of T3 tankers to
fully cellular containerships for Pan-Atlantic Steamship
Co. (later Sea-Land) with midbodies built at Schliekerwerft/Blohm+Voss,
Hamburg, Germany
- Designed
conversion of USN auxiliary aircraft carrier/fleet tanker
"CIMARRON" class to 34,000 dwt bulk carrier for Isbrandtsen
Co., NY.
- Performed
construction cost analysis in Germany for USA DDG construction
analysis for Todd Shipyards
1956-1959
- J.J.HENRY CO., INC., NY, Naval Architect and marine Engineer
- Designed
4-dragarm, rotating spoil arm 4,000 cu.m. hopper dredge
"ICOA" for National Bulk Carriers, Inc., NY
- Performed
plan approval on "EXPORT AMBASSADOR" class cargo ships for
American Export Lines, Inc., NY
- Performed
structural design of conversion of "MARINER" class cargo
ship to passengership "ATLANTIC" for American Banner Lines
(Arnold Bernstein) NY
- Performed
detailed cost analysis of C4 cargo ship in Germany for Committee
of American Steamship Lines for construction differential
subsidy determination
- Designed
series of 36,000 dwt tankers for construction at Ingalls,
Taiwan, Shipyard
- Designed
series of 45,000 dwt tankers for construction in Germany
for USA major oil companies
- Performed
onsite analysis and ship tests over Waini Bar, British Guyana
for transport of manganese ore for Union Carbide Co. in
order to design new ships. The test LST actually raised
12" over the mud bar!
1956
- SPARKMAN & STEPHENS, INC, NY, Naval Architect
- Performed
sailing yacht design.
1952-1961
- WHEELER YACHT COMPANY, INC, NY, Naval Architect
- Completed
apprentice program in all departments in wood and fiberglass
yacht construction and worked on designs for luxury yachts
from 26' to 96' including systems and fittings and lines.
AFFILIATIONS
- Society
of Naval Architects and Marine Engineers, NJ, Fellow
Society of Marine Port Engineers, NY
- Royal
Institution of Naval Architects, London, UK ,Fellow
Propeller Club, Port of NY
- Institute
of Marine Engineers, London, UK, Fellow Society of
Maritime Arbitrators, Inc., NY
- Associacion
de Ingenieros Navales y Oceanicos, Madrid, Spain
American Arbitration Association
- American
Boat and Yacht Council
- Maritime Law Association
- Institute
of Marine Engineers, Science & Technology, Fellow
PUBLICATIONS
- "DESIGNING
WITH WOOD IN SMALL BOAT CONSTRUCTION", NY Section1956 SNAME
Graduate Student Honor Prize
- "?BUQUES
Y FLETES: COMO VAN?" 1972, AINE Cadiz, Spain, "INGENIERA
NAVAL" Madrid 1972
- "SEA-LAND
ATLANTIC CLASS CONTAINER VESSEL (ACV) CONVERSION TO SL-31"
1995 N. CA Sect. SNAME
- "METHODOLOGY
OF AUDITING OFF VESSELS" 1994 Paper No.6, NY Met. Sect.
SNAME
- "CREATING
MARKET WINNERS-INNOVATIVE MAJOR CONVERSIONS: CASE STUDIES"
1996 SNAME & NSRP Ship Production Symposium, San Diego,
CA
EDUCATION
- Brooklyn
Technical High School, 1951
- Worcester
Polytechnic Institute, 1954 BS Mechanical Engineering
- University
of Michigan, 1958 MSE Naval Architecture & Marine Engineering
- University
of Canbourne, 2004 PhD (Honorary) Nautical Science
LANGUAGES
- Spanish,
fluent; German, beginner
LICENSE
- Chartered
Engineer, UK, #296314 (c.eng); Licensed Engineer, Europe,
FEANI # 20488 (Eur.Ing.)
|